TPC 2026
TPC 2026

 

 

Navigation: Drawings > Drawing Objects > XReferences >

Using XReferences in Ongoing Projects

 

 

 

 

XReferences can make all the difference when you are working with ongoing projects. They are the best way to stay current with changes that are made to the projects CAD files.


Tracking Project Changes

XReferences update themselves automatically when the referenced file changes. TPC looks at the date of the referenced file and automatically re-loads the XReference if the file date changes.

So think about accessing the CAD file via an on-line drive like Google Drive, Drop Box or OneDrive. As changes are made to the project's CAD files, the files dates are updated and TPC's XReferences re-load automatically, showing the recent changes made.

As a rule, these files are mirrored to a local drive on your computer. That's where you will want to install the XReference from and that's the location TPC will monitor for changes.


Calibrating XReferences

When you calibrate an XReference, you establish the relationship between the coordinate reference systems of your survey and the CAD drawing being referenced. Now, anytime the XReference needs to update (reload) itself, it reapplies that calibration automatically. So each time the CAD drawings get updated, TPC reloads the XReference, calibrates it, and displays it in your TPC drawing. You get everything you need to stay current with those project updates.

TPC then stores the referenced CAD file with the calibration as an associated file.  If you insert that same XReference into any other drawing in that survey, TPC prompts you to use that calibration. Generally, you will say yes, and that's it.

Note: When inserting an XReference, TPC searches the survey's calibrations for file associations to the referenced CAD file. If a calibration that contains that association has not yet been used in a survey, you will need to take the extra step of calibrating the XReference and selecting that existing calibration. Once used by the survey, it will be available to be used to calibrate the XReference the next time it is inserted into that survey.


Binding XReferences

Sometimes, you may want to lock in the status of a CAD project file to show work you did at a point in time.

Let say for example that you staked out some project features, like curb returns, based on a certain revision to the projects CAD drawing, then those staked objects change in a future revision. The next time the XReference updates, it will reload the newest revisions and you will loose the project features you already staked.

You can do this several different ways.

Use different filenames for each CAD file revision

This is the best option. If the project manager updates the CAD drawing filenames, you can use their new names.

1.No changes are required for existing XReferences. They will continue to reference their unchanged CAD file.

2.In any drawing where you want to track the revision, delete the current XReference.

3.Edit the calibration and open the Reference Files tab.

4.Add the new CAD filename to it, then close the calibration dialog. TPC will update the calibration as used by the survey. TPC will also save the changes to the calibration file for future use.

5.Insert a new XReference into the drawing and select the revised CAD file. TPC will prompt you to use the associated calibration. Choose Yes.

6.The new, revised XReference will come into the drawing calibrated.

Make a copy (static copy) of the last CAD file for each revision

If the project manager does not update the CAD drawing filenames, you can copy the original CAD file being referenced, then XReference the static copy, which will not change with future project revisions. You may even want to make this file Read Only.

1.In any drawing where you want to NOT track the revision, delete the current XReference.

2.Edit the calibration and open the Reference Files tab.

3.Add the CAD filename of the static copy to it, then close the calibration dialog. TPC will update the calibration as used by the survey. TPC will also save the changes to the calibration file for future use.

4.Insert a new XReference into the drawing and select the CAD file static copy. TPC will prompt you to use the associated calibration. Choose Yes.

5.The unrevised (static copy) XReference will come into the drawing calibrated.

Create a new or duplicate drawing and Bind the XReference in that drawing.

Another way to lock in the current revision of an XReference used in any TPC drawing is to bind it to the drawing. Binding an XReference converts the XReferences entities, layers and blocks to TPC entities, layers and blocks as if the XReference never existing. TPC then deletes the XReference from the drawing so that it is no longer able to update TPC's drawing.

The disadvantage of binding an XReference with lots of data is that it can greatly increase the TRV file size of the survey. Once bound, TPC writes all of the entities, layers and blocks to the TRV file. If the reference CAD file is small, this will have only a minimal impact on the survey file size.


Related Topics

XReferences
Calibrating an XReference

Editions