Beginning with TPC 2023 R1, calibrating an entire survey from local coordinates to a target CRS (Coordinate Reference System) is a special scenario that TPC uses to greatly simplify this workflow.
Convert Local to GNSS CRS (26:17) - We show you how to convert an existing survey from local grid to GNSS CRS so you can do stakeout.
Do the following
•From the TPC Desktop, choose Calibration | Calibrate.... TPC displays the Calibrate dialog.
Once these options are selected, TPC makes the following assumption.
•Your intention is to move the survey from it's local coordinate grid to the target CRS as if you had started that survey on the target CRS to begin with
•That's the workflow that will be accomplished with this scenario
TPC turns on the options to calibrate [X] Protected [X] Raw Data [X] Drawings [X] Details. Including all these options is important in order to ensure that the entire survey gets calibrated.
After calibrating the associated survey point, raw data, drawing object, etc., retain their new, calibrated position, rotation and scale, but don't retain any record of having been calibrated. Instead, they appear to have been created with this calibrated data.
Undoing This Calibration
The only way to undo this special calibration is with the Undo button in the Calibrate Survey dialog. Since the calibrated objects don't know they were calibrated, you can't undo their calibration using other calibration tools.