|
TPC defines a foresight as a point that is measured, then occupied before any other points are measured. A foresight record contains both the measured data used to compute a position for the foresight and the occupied point information like instrument height. Traverse PC uses the Occupied option from the Traverse View Type menu when designating either an occupied or foresight point type.
Note: The Type field will be blank for occupied/foresight points.
•Press the down arrow key until a new point is appended to the traverse.
•If the point type is blank, the point is considered to be an occupied point. If the point type is other than an occupied point, highlight the point and press [Ctrl]+[F10] or choose Type | Occupied.
•Enter the measurement to the foresight. Each time you enter a value, the cursor goes to the next field in the Edit Sequence.
•The description and target height are copied automatically from the previous point.
Related Topics
Traverse View Entering Traverse Data Ground Traversing
Editions
Personal, Premium, Professional
|